Located in the heart of the city next to the Idaho State Capitol Building, the Idaho Supreme Court project consisted of the demolition and replacement of the existing Air Handling Unit and Control Systems. In addition to the site-assembled AHU, project alternates were accepted that included new heating, chilled water pumps, variable frequency drives, a heat exchanger, and control elements.
Commissioned Systems and Equipment included:
- New Air Handling Unit
- New Heat Exchanger
- Heating and Chilled Water Pumps
- Variable Frequency Drives for New HVAC Equipment
- New Unit Heater
- Associated Controls and Control Devices for new HVAC equipment
- Temporary Heating HVAC Equipment & Controls
Location: Boise, ID
Owner: Idaho Division of Public Works
General Contractor: Cascade Enterprises
MEP Designer: Fulcher Engineering
Total Project Cost: $1.09M