Brewster Middle School

Brewster Middle School is the newest addition to the elementary school for the district which also recently completed MEP & envelope updates thanks to the construction team led by Fowler. It is providing much needed space for the growing student body along with a new gym.

NWESI performed air barrier leakage testing at Brewster Middle School to determine the air leakage characteristics and leakage locations following ASTM-E-779 test methodology to satisfy project requirements and Washington State Energy Code (WSEC).

Location: WA

BET
Building Envelope Testing